Sign In | Join Free | My infospaceinc.com
China Xi'an  Rig Oilfield Equipment Co., Ltd. logo
Xi'an Rig Oilfield Equipment Co., Ltd.
Xian Rig Oilfield Equipment Co., Ltd.
Verified Supplier

2 Years

Home > Workover Rig Components >

Workover Rig Components Supplied Worldwide For Oilfield Projects

Xi'an Rig Oilfield Equipment Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Workover Rig Components Supplied Worldwide For Oilfield Projects

Model Number : disc brake-350

MOQ : 1 pcs

Working calipers (set) : 2

Safety calipers (set) : 1(2)

Payment Terms : L/C, T/T

Safety braking torque (kN·m) : 28/56

Workover rig model : XJ350

Maximum Hook Load (kN) : 900

Certification : API

Delivery Time : 15-30 working days

Working brake torque (kN·m) : 61

Brand Name : XI'AN RIG

Place of Origin : China

Contact Now

Wellhead Equipment and Well Control Safety System (Workover Safety Barrier Assembly)

Workover operations face pressurized wells, oil and gas wells, overflow wells, and sand-producing wells, making well control equipment of paramount importance.

1. Wellhead Christmas Tree Assembly

Comprising gate valves, a cross (spool), casing head, and tubing hanger, it is the main wellhead equipment of oil and water wells. Workover operations require coordination of opening, closing, disassembly, and makeup operations on it.

2. Workover Blowout Preventer (Simple BOP, Ram BOP)

Lightweight well control equipment dedicated to workover operations. During operations, it seals the wellhead and prevents kicks, blowouts, upward migration of oil and gas, and overflow of oil and water, ensuring the safety of operations on pressurized wells.

3. Wellhead Sealer and Self-Sealing Wellhead (Snubbing/Stuffing Box Type)

Automatically seals the annulus as tubing runs in and out during operations, preventing well fluids, oil, and gas from spraying out — the most commonly used safety component in routine workovers.

4. Choke Manifold and Flare (Flow) Line

Used for pressure relief, flaring, and choke-controlled pressure regulation, safely releasing wellbore pressure under abnormal conditions and smoothly controlling wellhead pressure.

5. Pressure Monitoring Gauges — Tubing Pressure and Casing Pressure Gauges

Monitor tubing pressure and casing pressure in real time, judging the downhole oil and gas activity and formation pressure changes, and guiding kill and pressure-control operations.

Workover Rig Components Supplied Worldwide For Oilfield Projects

Workover rig model Working calipers (set) Safety calipers (set) Maximum Hook Load (kN) Working brake torque (kN·m) Safety braking torque (kN·m)
XJ250 2 1 675 61 28
XJ350 2 1(2) 900 61 28/56

Product Tags:

workover wellhead christmas tree

      

ram bop well control equipment

      

choke manifold flare line

      
Quality Workover Rig Components Supplied Worldwide For Oilfield Projects for sale

Workover Rig Components Supplied Worldwide For Oilfield Projects Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Xi'an Rig Oilfield Equipment Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)